20+ years building UI for the enterprise

Build beautiful applications, effortlessly.

Ready-to-use UI Controls, components, libraries and AI-powered tools for .NET desktop (WinForms, WPF) and the Web — standards-based custom elements the browser renders itself, so they drop into any stack: Angular, React, Vue, Blazor, ASP.NET, Django, or plain HTML5 with no build step. 282 controls and components, crafted for developers who care about polish.

282UI Controls & Components: 112 desktop, 170 web
.NET 4.8–10WinForms & WPF desktop
170 Web ComponentsTreeListView among them — any stack, or none
20+ yrsSince 2002, UK
Screenshot-style illustration of a software dashboard UI with a sidebar, a data grid, a hierarchical tree list and an activity chart
Also from Binarymission

TreeListView – Now its own dedicated product

Our flagship tree grid is now a standalone Web Component with its own home, playground and demos at treelistview.com, with grouping, inline editing and a hundred-thousand-row ceiling.

  • Framework-neutral: works with any web framework, or in plain HTML5
  • Unified tree + list views, with filtering, sorting & lazy-loading
  • Rows added, moved and removed by code, drag or keyboard, with change tracking
  • A find bar over every row, an Excel-style value filter, pinned parents and tree lines
  • Grouping with live aggregates, a totals row and inline editing
  • Per-column filters, multi-column sort and column reordering
  • Banded two-row headers, and auto-fit column widths
  • Cascading tri-state checkboxes, and parent roll-up summaries
  • Multi-cell paste from a spreadsheet, with undo and redo
  • Master/detail panels, and saved views your users name themselves
  • Conditional formatting with data bars, and cell-level range selection
  • A server-side data source, a built-in pager, and column virtualisation
  • Real .xlsx export: sums and filters, not a table of text
  • Typed React, Angular and Vue wrappers, generated from the component's own API
  • Nineteen built-in themes, plus full CSS-variable theming
  • Virtual scrolling: a hundred thousand rows stays responsive
  • Live interactive playground: try it with your own data before you buy
  • Platforms: Web — any framework or server stack, or plain HTML5 with no build step. TreeListView is also available for WinForms and WPF
Screenshot-style illustration of the TreeListView hierarchical tree and list data grid
Screenshot-style illustration of a component library catalog browser showing a searchable grid of UI controls
New — shipped and live

BMX Web Components – One hundred and seventy of them, in one script tag

BMX is our second commercial component product: standards-based custom elements that the browser renders, not a framework. The same markup works unchanged in plain HTML, React, Angular, Vue, Svelte, Blazor and ASP.NET MVC — with no bundler, no module graph and no build step.

  • Zero dependencies: one self-contained file, nothing to npm install, nothing phoning home — what a security review sees
  • Fast at any size: real DOM virtualisation, one paint per frame, and nothing left behind when an element leaves the page
  • WCAG 2.2 AA by construction, with full WAI-ARIA keyboard patterns
  • Ten themes, retintable from a dozen CSS custom properties
  • Typed React, Angular and Vue wrappers, generated from each component's own API
  • Platforms: Web — any framework or server stack, or plain HTML5 with no build step

In every licence

  • Buttons, fields, choices, navigation, feedback and display — the whole set
  • A select and combobox windowed to stay smooth at five thousand options
  • An upload field with per-file progress, cancel, retry and chunking
  • A calendar with month, agenda, week and day views, and keyboard rescheduling
  • An org chart drawn by a tidy-tree algorithm, and announced as a tree
  • Whole forms from JSON, with conditions, calculations, steps and checks, and a query builder that writes SQL, MongoDB and OData
  • Barcodes, PDF417 and QR codes, a signature pad, and a field that reads codes from a scanner or the camera
  • A stepper for checkouts, set-ups and imports, with each step checked before the next
  • A command palette behind Ctrl+K, and product tours that walk new users round any screen
  • A colour picker that checks contrast as you choose, and a transfer list for a hundred thousand items
  • A recurrence editor that writes calendar rules and cron, with the next dates in their own time zone
  • A notification centre with stacking, snoozing and actions, and a filter panel that counts every facet

Also in Hypernova Pro and Gold

  • A Gantt chart, a PERT chart and a task board
  • A report viewer and a report designer
  • A formula engine with 406 Excel functions, and a formula bar
  • A resource scheduler for rooms, people and equipment across time zones
  • Twenty-two kinds of chart and a sparkline
  • A rich text editor, and a chat for your own AI
  • A code editor and a code diff; gauges and a dashboard layout
  • A timeline from millennia to milliseconds, and a file manager over storage of your own
  • A property grid for designers and settings, and a permissions matrix that explains every cell
  • A review layer that pins comments to any page, with replies and @mentions
  • A JSON editor checked against your schema, and a terminal for shells, logs and consoles
  • A media player with captions, chapters and a transcript, and a risk matrix with appetite and movement
  • An API explorer that documents and tries any OpenAPI description, and a mind map built from the keyboard
  • A dock layout for IDE-style workspaces, a gallery for ten thousand pictures, and 360-degree virtual tours
  • A timesheet checked as people type, and a booking picker your customers book with
  • A seat map for theatres, arenas and aircraft, and a mail viewer that opens .eml, .msg and .mbox safely
  • An XML editor checked against your schema as you type, and a translation editor for XLIFF, PO and String Catalogs
  • A YAML editor for configuration files that keeps every comment, and a BOM editor that rolls up cost as you type
  • An SQL editor that checks six dialects against your schema, and a PDF organiser that merges, splits and protects files in the page
  • A Markdown editor with a live preview and checks, and a PDF form filler that also makes plain PDFs fillable

Also in Hypernova Gold

  • A log stream that searches a million lines in the page
  • An infinite canvas for planning and drawing together
  • A data grid for a million rows from any source, with trees, detail rows and a pivot
  • A multi-dimensional pivot grid with slicers and a pivot chart, totalled in the browser
  • A form designer that lets your own users build their forms
  • An image editor that removes a photo's private details, and a diagram designer
  • A spreadsheet with Excel files in and out, and a map with the world built in
  • A network graph that lays out, measures and plays back ten thousand nodes
  • A PDF viewer with its own PDF engine, comments, form fields and passwords included
  • A data importer for CSV, Excel and JSON, and a DMN decision table for business rules
  • A floor plan for booking desks and rooms, and a workflow designer with the engine that runs it
  • A data mapper that draws and runs integrations, and a 3D model viewer for STL, OBJ, glTF and GLB
  • An email template designer that sends HTML mail clients really draw
  • A planning grid for budgets and forecasts, and a configurator that prices and quotes
  • Document compare for Word, PDF and HTML, and an annotation studio for machine-learning data
  • A caption editor on the waveform, and a reconciliation workbench with sign-off
  • A time-series explorer for millions of points, a document signer, and a shift roster that fills itself
  • A process explorer that mines event logs, a trace viewer with the critical path, and a lineage graph down to the column
  • A label designer that prints to sheets and thermal printers, and a data profiler that scores a file’s quality
  • A driver tree for what-if planning, and an audio editor that bleeps card numbers out of calls
  • A word processor that opens and saves Word documents, and a document scanner for the camera
  • A trading chart with fifty-nine indicators and an order book, plant displays with ISA-18.2 alarms, and a CAD viewer for DXF drawings
  • A presentation editor for PowerPoint files, and a video editor that exports MP4 in the browser
  • A PCB viewer for Gerber files, a deep zoom viewer for gigapixel slide scans, and a sequence viewer for DNA
  • An EDI editor for EDIFACT and X12, and an XBRL viewer for financial filings
  • A point cloud viewer for laser scans, a rack designer for server rooms, and a route planner for deliveries
  • A chemical structure editor for lab notebooks, a load planner for containers and trailers, and a geo editor for map features
  • An SBOM viewer that judges every licence against your policy, and a text annotator for training language models
  • A threat modeller that suggests STRIDE threats from your diagram, and a profile viewer with flame graphs and comparisons
  • A print designer for web-to-print with print-ready PDFs, a ladder editor that simulates PLC programs, and a plate designer that fits IC50s
  • A notebook for Markdown, JavaScript and SQL, a record matcher that merges duplicates, and a PDF redactor that takes out what lies under each mark
  • A spectrum viewer for NMR, infrared and mass spectra, and a requirements tracer with coverage and suspect links
109 flagship products · part of the 170 BMX components

Find the component you came for

The 170 BMX Web Components cover the whole application: enterprise-grade business components, alongside the everyday controls every screen needs – from buttons and inputs to dialogs, menus, notifications and filters.

  • Data and analysis Data and pivot grids, spreadsheets, reporting, time-series analysis, data import, data profiling and data lineage
  • Finance and operations Budgeting, reconciliation, risk registers, product configuration, scheduling, shift rostering, desk booking, driver trees and process mining
  • Documents and media PDF viewing and e-signing, document comparison, label printing, email, video with captions, audio editing, photo galleries, virtual tours, 3D models and image labelling
  • Platform and tools API consoles, integrations, workflows, business rules, distributed tracing, audit logs, docking workspaces and mind maps

Below are the 109 flagship products. Choose a family, then a product: every one runs in the browser with nothing to install, and every one is live in the showcase.

In Hypernova Gold

Data Grid – A million rows, from any source

The data grid is the table your application is built around. Bind it to whatever your data is in, and it stays smooth at a million rows, because only what is in view is ever drawn.

  • Any data source — arrays, REST and JSON APIs, CSV, JSON lines, a file the reader opens, an HTML table, your server a block at a time, or a live WebSocket feed
  • Fifty column types, each sorting, filtering and editing by its meaning
  • Grouping with totals, trees, master-detail rows and a pivot
  • Spreadsheet-grade editing: validation, undo even after saving, paste from Excel, a fill handle
  • Cards on phones, pages, printing, and Excel files in the grid's own colours
  • No dependencies, any framework or none, and accessible from the keyboard
  • Platforms: Web — any framework or server stack, or plain HTML5 with no build step
The BMX data grid showing an order book of twenty thousand orders grouped by region, with totals in each group row, status badges, priorities, progress bars, due dates and weekly sparklines, and the order ids pinned on the left
The BMX pivot grid showing a hundred thousand sales by region, country and category down the side and by year across the top, with revenue as data bars, margins with arrows, subtotals for every region, and the field list open at the side with its Filters, Columns, Rows and Values areas
In Hypernova Gold

Pivot Grid – Every dimension, totalled in the browser

The pivot grid turns records into totals by any number of dimensions at once, worked out in the page on a background thread: half a million records in well under a second, with no server and no third-party code.

  • Multi-dimensional — any number of fields down the side, across the top and as filters, nested as hierarchies that open and close
  • Sums, averages, medians, distinct counts, your own functions and formulas such as [Revenue] − [Cost]
  • Slicers and a pivot chart that follow it
  • Conditional formatting, and Excel files with the formatting kept as Excel's own
  • Drill-through to the records behind any total
  • Your own server can answer the totals when the records are too many to send
  • Platforms: Web — any framework or server stack, or plain HTML5 with no build step
In Hypernova Gold

Spreadsheet – Excel in your page, with no server behind it

A whole spreadsheet in one element, with the toolbar, formula bar and keyboard your users already know, over 406 Excel functions. Excel files open and save with their formulas and their looks, and nothing leaves the page.

  • 406 Excel functions — dynamic arrays, LET and LAMBDA, names and formulas across sheets
  • Number formats, fonts, fills, borders, merged cells and frozen panes
  • Conditional formats with colour scales, data bars and icons; validation lists
  • Sort, filter, find and replace, notes, and a fill handle that carries series on
  • Excel files in and out with their looks; CSV and JSON too
  • Only the cells in view are drawn, so twenty thousand rows scroll like twenty
  • Platforms: Web — any framework or server stack, or plain HTML5 with no build step
The BMX spreadsheet on a sales plan for the first half: the formatting toolbar and formula bar, product rows by month in pounds with a colour scale, totals with data bars, growth and a status column with one product to watch, and a table of regions with their share as data bars and how each did against plan
In Hypernova Pro and Gold

Formula Engine – Spreadsheet formulas, with no spreadsheet

The formula engine works out sheets of values and formulas inside your own page, the way Excel does, and keeps every cell up to date as anything changes. The formula bar gives your users Excel's own way of typing them.

  • 406 Excel functions — dynamic arrays that spill, LET and LAMBDA, tables, names and formulas across sheets
  • A hundred thousand formulas recalculated in about half a second: only what a change touches is worked out again
  • Form fields tied to cells with an attribute, so a quote or a calculator needs no script
  • Excel files opened and saved in the browser, formulas and all
  • A formula bar with colours, completion, argument hints and references outlined in the grid
  • A background thread for big workbooks, and a Node module for a server
  • Platforms: Web — any framework or server stack, or plain HTML5 with no build step, plus the formula engine for Node
The BMX formula engine working out a quote: four items with their prices, quantities and line amounts, the goods total, an 8% discount band, delivery, VAT and the total, and below them the Quote sheet's formulas, from SUM and XLOOKUP to ROUND, IFS and TEXT, with the value each one gives
In Hypernova Gold

Log Stream – A million log lines, searched in the browser

The log stream opens server logs, access logs, audit trails and build output in the page and makes them searchable at once — with nothing uploaded, and no log server to run.

  • Log stream — JSON lines, logfmt, syslog, access logs, CSV and plain text, read on sight
  • Search by word, pattern and field: status:>=500, level:>=warn, exclusions and OR
  • A timeline of the errors, and each field's commonest values, a click from a filter
  • Emails, IP addresses, card numbers, tokens and keys masked on screen and in every export
  • Live from a WebSocket or server-sent events, reconnected when it drops
  • Bookmarks, and the whole view as one short string for a link or a ticket
  • Platforms: Web — any framework or server stack, or plain HTML5 with no build step
The BMX log stream showing an API gateway's log as columns: a timeline of warnings and errors with a red spike mid-morning, the matching lines with their time, level, service, status and region, and a fields panel listing each field's commonest values
The BMX chart on a sales dashboard: revenue by month in columns with the margin as a line on a second axis and a dashed target, orders by channel in a doughnut, revenue by region as stacked areas, and a funnel from visitors to orders
In Hypernova Pro and Gold

Chart and Sparkline – Twenty-two kinds of chart, with no charting package

Charts drawn by the library itself, with nothing else to load and nothing sent anywhere, from columns and doughnuts to treemaps, sankeys and candlesticks. The sparkline puts a trend the size of a word into a table or a sentence.

  • 22 kinds of chart — stacked or as shares, with a line on a second axis, targets and ranges
  • Time axes in any time zone; drag across a chart to zoom in
  • A million points stay quick: lines keep their shape, and large series are painted on a canvas
  • Every value read from the keyboard, the numbers as a table, and patterns as well as colour
  • A sparkline for a table cell or a sentence: line, area, columns, wins and losses, or a bullet
  • Saved as PNG, SVG or CSV, in the page's theme, light or dark
  • Platforms: Web — any framework or server stack, or plain HTML5 with no build step
The BMX dashboard of a support desk: tiles with handles for open tickets on a dial with bands and a target, average first response on a needle dial, customers satisfied on a ring, tickets by hour as stacked columns, a bullet graph of tickets resolved within a day, and this week's channels with sparklines
In Hypernova Pro and Gold

Gauge and Dashboard – Figures at a glance, tiles your users arrange

Gauges that show a figure against its scale, and a dashboard layout whose tiles your users drag, resize and keep. Put anything in a tile: a chart, a gauge, a grid, or your own markup.

  • Dials, rings, bars and bullet graphs, with bands, a target and the change
  • Gauges your users set, as form fields
  • Tiles dragged, resized, opened and removed, from the mouse or the keyboard
  • Tiles locked in place, and every move announced
  • The layout as JSON, or kept in the browser for each user
  • Fewer columns on narrower screens, and one on a phone
  • Platforms: Web — any framework or server stack, or plain HTML5 with no build step
In Hypernova Gold

Map – Your figures on the world, with no map service

A map with the world built in, so a figure per country is all it needs. It loads no tiles and calls no map service, so nothing about your data leaves the page.

  • Countries coloured by value in steps, quantiles, your own breaks or either side of zero
  • Markers sized by value and grouped when they crowd; great-circle routes
  • Four projections; pan, zoom and pinch; choose countries
  • Every figure read from the keyboard, and a table view
  • Your own regions as GeoJSON or TopoJSON
  • Saved as SVG, colours and all
  • Platforms: Web — any framework or server stack, or plain HTML5 with no build step
The BMX map of customers by country on an Equal Earth projection: countries shaded in five blues by number of customers, office markers sized by staff with groups of four and two where they crowd, dashed great-circle routes from London to New York, Bengaluru, Singapore and Sydney, India and Brazil chosen, and the legend underneath
The BMX network graph of who works with whom: 150 people in six departments, coloured by department and gathered into their communities, with the people who join the company up drawn larger and named, zoom, fit, lasso and table buttons, and a legend of the departments underneath
In Hypernova Gold

Network Graph – Anything made of links, laid out and read for you

People, accounts, services and the links between them, laid out on a canvas in your page. It finds the communities, measures who holds the network together, and plays it back as it grew.

  • Force, hierarchy, radial, circular and grid layouts, with nodes your users drag and pin
  • Communities found and coloured; betweenness and PageRank shown as size
  • The shortest path between two nodes, one key away
  • A time bar that plays the network as it grew
  • Groups folded into one node, and nodes that load more when opened
  • An overview of the whole, and ten thousand nodes laid out in seconds
  • Platforms: Web — any framework or server stack, or plain HTML5 with no build step
In Hypernova Pro and Gold

Gantt, PERT and Task Board – Plan projects, three views of one plan

Three views of one plan, scheduled by the same critical-path engine on WinForms, WPF and the Web — so a plan gives the same dates on the desktop and in the browser.

  • Gantt chart — a task list beside a timeline, with links, lag and lead, summaries, milestones, baselines and float
  • PERT chart — the same plan as a network, with early and late dates and float in every box
  • Task board — Kanban columns by status, with WIP limits and swimlanes
  • Critical-path scheduling over a working calendar, with weekends and holidays
  • Drag, resize and link by mouse, or do all of it from the keyboard
  • Virtualised for plans of a thousand tasks and more; export to SVG or PNG, and print
  • Platforms: WinForms, WPF and the Web (any framework or server stack, or plain HTML5 with no build step)

Also for the desktop: WinForms · WPF

Screenshot-style illustration of one project plan shown three ways: a Gantt chart with dependency links and milestones, a PERT network with the critical path highlighted, and a Kanban task board
The BMX resource scheduler showing a day of bookings for three rooms, four people in London, Bengaluru and New York, and three vans, with working hours shaded, repeating bookings marked, a training lab holding two courses at once, and a clash in the board room outlined in red
In Hypernova Pro and Gold

Resource Scheduler – Bookings and capacity, across time zones

Book rooms, people and equipment from your own application. The resource scheduler is a booking diary: resources down the side, time across, and every booking where it falls, in each resource's own time zone and working hours.

  • Day, week, month and agenda — drag to book, move and resize, or do all of it from the keyboard
  • Each resource in its own time zone, with its own working hours and holidays, across clock changes
  • Repeating bookings by the calendar's rules, changed one at a time, from here on, or all together
  • Clashes and out-of-hours bookings allowed, warned about or refused
  • The first time several people are free together, found for you
  • Calendars in and out as .ics files; hundreds of resources stay smooth
  • Platforms: Web — any framework or server stack, or plain HTML5 with no build step
In Hypernova Pro and Gold

Timeline – Moments and spans, from millennia to milliseconds

Things in time, in rows that nest and fold. Zoom from centuries to a single second, in any time zone, and let your users move and stretch items with your page checking every change.

  • Points, ranges, boxes and shaded spans, in rows that nest and fold
  • An axis that always counts in sensible steps, BC included
  • Overlaps stacked into lanes; busy rows gathered into clusters
  • Any time zone, daylight saving included
  • Move, resize and add, each change checked by your page first
  • A navigator for the whole range, and fifty thousand items kept smooth
  • Platforms: Web — any framework or server stack, or plain HTML5 with no build step
The BMX timeline of a product launch over twelve weeks: product, marketing and support rows that fold, each with nested rows of tasks as bars from discovery and design to the user guide and FAQ, a code freeze shaded, a launch line on 2 November with the blog post and embargo as points, and zoom, fit and table buttons
The BMX report viewer showing a sales overview report: a column chart of sales by region, a doughnut of top customers and a stacked chart by month, with page thumbnails beside it
In Hypernova Pro and Gold

Report Viewer and Designer – Reports in the browser, no report server

A report viewer and a report designer that run entirely in the browser: real pages drawn the same on screen, on paper and in the PDF — and your users can design their own reports.

  • Report viewer — groups, totals, parameters, charts, crosstabs and barcodes, with find, zoom and contents
  • Report designer — drag fields onto bands, add charts and crosstabs, and preview as you go
  • Tagged, accessible PDF with your own fonts, for any alphabet; Excel and CSV export
  • Drill down, drill through and sort, right in the page
  • The same engine renders on a server, as a Node module
  • Report definitions are plain JSON, safe to store and open
  • Platforms: Web — any framework or server stack, or plain HTML5 with no build step, plus the reporting engine for Node on a server
In Hypernova Pro and Gold

Rich Text Editor – Writing and review, with nothing loaded from anywhere

A rich text editor that keeps everything in the page: no cloud service, no licence server and no script fetched from anywhere, with comments and tracked changes for review.

  • Everything a document needs — headings, lists and check lists, tables, images, code and links
  • A slash menu for blocks, mentions of people, and Markdown typed as you go
  • Comments with replies, and tracked changes to accept or reject
  • Paste from Word or Google Docs that arrives clean, with its lists kept
  • One sanitiser for everything typed, pasted or loaded, so a document cannot carry script
  • HTML posted with its form; Markdown, plain text and JSON out
  • Platforms: Web — any framework or server stack, or plain HTML5 with no build step
The BMX rich text editor on a release note under review: a heading, a commented phrase, a suggested insertion and deletion, a table and a checklist with a mention, the comments panel with a reply beside it, and the status bar counting two changes to accept or reject
The BMX code editor on a TypeScript file of order totals: coloured code with line numbers, three cursors on the word total, a warning underlined on line 21 with a marker in the gutter, and the status bar reporting three cursors, two-space indents and TypeScript
In Hypernova Pro and Gold

Code Editor and Code Diff – Write and review code, with no editor package

The code editor your users know from their own tools, and a diff that shows what changed, in your own pages. Nothing is loaded from anywhere, and a million lines stay quick.

  • Twenty-six languages coloured, and languages of your own
  • Several cursors, find and replace with regular expressions, folding and matching brackets
  • Problems from your own checker underlined; JSON checked as it is typed and formatted
  • Suggestions of your own, and a form field like any other
  • A diff side by side or in one column, with the changed words marked
  • Revert or accept each change, and git patches shown file by file
  • Platforms: Web — any framework or server stack, or plain HTML5 with no build step
In Hypernova Gold

Image Editor – Crop, adjust and redact, with the private details removed

A picture editor for your own pages, entirely in the browser. A phone photo carries where it was taken, the camera and sometimes the owner: the editor finds them, says so, and removes them before the picture is saved.

  • Crop to any shape — free, a fixed ratio, or round for a profile picture; rotate, flip and straighten
  • Light and colour with a live histogram, an automatic fix, and nine looks
  • Arrows, boxes, text, highlights and numbered steps
  • Redaction burnt into the pixels, so nothing underneath can be recovered
  • Location, camera, serial number and owner found and removed; a photo saved unchanged is not compressed again
  • In front of an upload, so every picture is edited and cleaned before it is sent
  • Platforms: Web — any framework or server stack, or plain HTML5 with no build step
The BMX image editor adjusting a phone photo of a lake at sunrise: the tool tabs, the photo, a histogram with light sliders for exposure, brightness, contrast, highlights and shadows, and a note that location and camera details were found and are removed when the photo is saved
The BMX file manager showing a folder of photos as tiles: a folder tree on the left, a toolbar for new folder, upload, cut, copy, paste, rename, delete and download, a path, search, and one picture selected and previewed on the right with its type, size, date and a download button
In Hypernova Pro and Gold

File Manager – The file window your users know, over storage of your own

Folders, details or tiles, search, preview, drag and drop, upload and download, in your page. The files stay where you keep them; Binarymission hosts nothing.

  • A folder tree, a path, details or tiles, sorting and search
  • A preview of pictures, text and code
  • New folder, rename, delete, cut, copy and paste
  • Drag and drop between folders, and from the desktop to upload
  • Your own server through a small JSON convention, files in the page, or a provider of your own
  • Every action checked by your page first; fifty thousand files in a folder
  • Platforms: Web — any framework or server stack, or plain HTML5 with no build step
In Hypernova Gold

PDF Viewer – PDFs in your page, with no plug-in and no server

Show a report, a contract or a manual in your own page, drawn by the library's own PDF engine. Nothing is uploaded and no third-party code is loaded: the file never leaves the page.

  • Its own PDF engine — embedded fonts, images, transparency and gradients
  • Page width, whole page, zoom and rotation; thumbnails and the outline
  • Find with every match lit, and real text to select and copy
  • Links, comments with their notes, and form fields with their values
  • Password-protected files up to AES-256, and damaged files read
  • Thousands of pages open at once; print and download
  • Platforms: Web — any framework or server stack, or plain HTML5 with no build step
The BMX PDF viewer showing an annual report: the outline down the left, a search for Nordics with the word highlighted on the page, a pie chart of sales by region, and a comment from Finance open over a highlighted sentence
Renderer in every licence, designer in Hypernova Gold

Form Renderer and Designer – Forms from JSON, built in the browser

The form element draws a whole form from a JSON description with the library's own controls, so a form can change on your server without anyone changing the page. The form designer lets your own users build those forms by dragging fields onto pages.

  • 28 field types — from text, money and dates to repeating rows, files and a signature pad
  • Conditions and calculations in a small language that never runs script
  • Steps with a progress list and a review of every answer before it is sent
  • A clear message beside every answer that needs one, and your server's errors put back against the fields
  • Drafts kept as the reader types, and the answers shown read only for a record
  • The designer: a palette, a properties panel, a condition builder, a live preview and the JSON, in Hypernova Gold
  • Platforms: Web — any framework or server stack, or plain HTML5 with no build step
The BMX form designer building an order form: the palette of field types on the left, the form's items, delivery choice and address section in the middle, and the address section's Logic tab on the right, with a condition being built from Delivery, is not and Collect
In every web licence

Query Builder – Filters your users build, written out for your database

Your users say which records they mean, in rules and groups, without writing a query. The query comes out in the language your database or service speaks, with every value a parameter.

  • AND, OR and NOT in groups, nested as deep as you allow
  • Typed fields with 28 comparisons, and a field compared with another field
  • SQL for ANSI, PostgreSQL, MySQL, SQL Server, SQLite and Oracle
  • A MongoDB filter, OData, JsonLogic, or a filter for records in the page
  • Read back as a sentence, and posted with its form as JSON
  • The same checks and conversions on your server, in every package
  • Platforms: Web — any framework or server stack, or plain HTML5 with no build step
The BMX query builder on a customer filter: country is one of four, age between 25 and 60, a nested OR group of spent more than credit limit or tags vip or trade, and joined in the last two years; under it the PostgreSQL with numbered parameters, and a table of the three customers who match
In every web licence

Barcodes & Signatures – Labels, codes and signatures, drawn in the page

Barcodes and QR codes as sharp vectors, a signature that goes into a form like any field, and a field that takes a code from a scanner or the camera. Nothing is kept or sent anywhere.

BMX barcodes for labels, products and parts: a parcel label with an address, a QR code, a Code 128 tracking barcode and a Data Matrix, beside EAN-13, UPC-A, EAN-8, ITF-14, Code 39 and Data Matrix symbols with their digits underneath
The BMX stepper on a checkout: Basket done, Delivery marked as needing attention because the postcode was refused, the delivery fields and an order summary, and Back and Next
In every web licence

Stepper – A long task, one step at a time

Checkouts, account set-ups, claims and imports, broken into steps your users can follow, with each step checked before the next one opens.

  • A step list across the top or down the side: done, current and needing attention
  • Next checks the step's fields and your own rules first, and says why when it refuses
  • Steps in order, or in any order; optional and unavailable steps
  • Moved by your page itself when the work drives it
  • “Step 2 of 5” with a progress bar on a phone
  • The keyboard along the list, and every step's state read out
  • Platforms: Web — any framework or server stack, or plain HTML5 with no build step
The BMX data importer reviewing a stock take read from an Excel workbook: twenty rows with values calculated from the workbook's formulas, a count typed as a word marked as not a number, a repeated item code flagged as a duplicate, and Import 16 rows, skip 4 at the foot
In Hypernova Gold

Data Importer – The spreadsheet your customer has, as clean rows

CSV, Excel and JSON files turned into checked records for your application, in the browser. The file is never uploaded, and your users fix what is wrong before anything is saved.

  • CSV, TSV, Excel and JSON — separator, encoding, headings and formulas worked out
  • Columns matched to your fields by name, aliases and what the values look like
  • Dates either way round and numbers with either decimal mark
  • Every value checked against your rules; problems fixed in a grid
  • Duplicates and bad rows removed in one go, with undo
  • Your server has the last word; a hundred thousand rows read with progress
  • Platforms: Web — any framework or server stack, or plain HTML5 with no build step
In every web licence

Command Palette – Ctrl+K, a few letters, Enter

The quickest way round your application: actions, pages and your own records, found together as your users type, with the keyboard never leaving their hands.

  • Fuzzy matching that understands initials and missed letters
  • Groups, icons, shortcuts and badges; recent commands first
  • Your own data searched as your users type, from any number of sources
  • Commands that open a page of their own choices
  • Shortcuts that work anywhere on the page
  • A dialog over the page, or always open inside it
  • Platforms: Web — any framework or server stack, or plain HTML5 with no build step
The BMX command palette over a billing application: inv typed, with New invoice, Send invoice reminders, Export invoices as CSV and Go to Invoices matched and their letters highlighted, keyboard shortcuts beside them, and three customers found by the page's own search
A BMX product tour on a sales dashboard: the page dimmed except the period selector, which is ringed, and a card beside it reading 2 of 6, Choose the period, with Back and Next
In every web licence

Product Tour – A guided walk, one card at a time

Show new users round any screen: a card beside each thing that matters, the rest of the page dimmed, and steps that let them try the real control.

  • A cut-out around each target, the rest of the page dimmed
  • Steps that move on when your users do what they ask
  • Tours that branch, and your page's say before each step
  • Waits for parts of the page that arrive late
  • Follows its target as the page scrolls; never hidden under a sticky header
  • A proper dialog for screen readers, focus returned at the end
  • Platforms: Web — any framework or server stack, or plain HTML5 with no build step
In Hypernova Pro

Property Grid – The panel beside every designer

Whatever your users select, its properties in categories, each with the right editor, checked as it is typed and with undo behind it.

  • The right editor for text, numbers, sliders, switches, lists, flags, dates and colours
  • Nested objects and lists to add to and remove from
  • Several objects edited together, differing values shown as such
  • Required fields, ranges, patterns and your own rules
  • Your page can refuse any change; undo, redo and reset
  • Editors of your own, through the same checks
  • Platforms: Web — any framework or server stack, or plain HTML5 with no build step
The BMX property grid editing two fields of a form at once: two objects selected, values they share shown once and values that differ shown as mixed, categories for content, data, rules and layout, a colour, a slider and the focused property's description at the foot
The BMX permissions matrix for a finance system: Staff, Manager, Auditor and Finance lead across the top with read, create and approve under each, resources down the side as a tree, ticks and crosses set or inherited, one unsaved change marked, and the line at the foot explaining that a Manager is denied reading Payroll because Staff is
In Hypernova Pro

Permissions Matrix – Who can do what, and why

Roles across, resources down, an answer in every cell, worked out through inheritance and explained, with changes your page can review before they are saved.

  • Allow, deny or inherit in every cell, roles and resources inheriting
  • Every cell explained: which grant decided it, through which roles
  • Deny or allow overrides when inherited roles disagree
  • Select a range and set it in one go; undo and redo
  • Changes held until Save, offered to your page first
  • Export to CSV; only the rows in view drawn
  • Platforms: Web — any framework or server stack, or plain HTML5 with no build step
In Hypernova Gold

Decision Table – Business rules the business can read

Approvals, prices and routing as DMN rows that people can read, try, check and change, with an explanation of every answer.

  • DMN decision tables with all seven hit policies
  • Cells in DMN's simple tests, or as spreadsheet formulas
  • Which rule fired and why, in sentences
  • Gaps, overlaps and rules that never fire, found for you
  • Test cases kept with the rules
  • DMN 1.3 XML in and out; ten thousand cases in a tenth of a second
  • Platforms: Web — any framework or server stack, or plain HTML5 with no build step
The BMX decision table for loan pre-approval: credit score, employment and loan to income as inputs, decision and rate as outputs, nine rules with the fourth lit as the one that fired, the cells that stopped the other rules struck through, and the answer Approve at 0.059 under Try it
The BMX colour picker in the page beside an application preview: a light blue chosen as the text on a blue brand colour, the contrast check reading 3.00 to 1 and failing AA, with a Fix to 4.5 to 1 button, swatches in brand, accent and neutral groups, and recent colours
In every web licence

Color Picker – Brand colours, readable text

A colour field, or a panel in the page, that reads any CSS colour, writes the format you choose, offers your design tokens as swatches and checks every colour for contrast as it is chosen.

  • Hex, RGB, HSL and OKLCH, with opacity
  • Your design tokens as swatches that follow the theme
  • A live WCAG contrast check for text, large text or graphics
  • One press to the nearest colour of the same hue that passes
  • Recent colours and the screen eyedropper
  • Goes into a form like any other field
  • Platforms: Web — any framework or server stack, or plain HTML5 with no build step
In every web licence

Transfer List – Available, chosen, and every move between

People to a role, columns to a report, fields to an export: two lists that filter as you type, move by button, key or drag, and stay quick at a hundred thousand items.

  • Filters on both sides, across labels, second lines and groups
  • Move by button, Enter, a double click or a drag; reorder with Alt and the arrows
  • Groups, locked and disabled items, a minimum and a maximum
  • Every move offered to your page to refuse
  • A hundred thousand items, only the rows in view drawn
  • Goes into a form, one entry for each chosen value
  • Platforms: Web — any framework or server stack, or plain HTML5 with no build step
The BMX transfer list choosing payment approvers: Everyone filtered for fin, two accountants selected under Finance, and six approvers chosen on the right, two directors among them locked in place
The BMX review layer over a landing page: numbered pins on the hero and on a price card, a thread open beside its pin with three replies and an @mention, and the list of open comments down the right
In Hypernova Pro

Review Layer – Comments pinned where the work is

Wrap any page, a design, a dashboard, a form, a document, and reviewers click anything to start a thread on it. Pins follow the content wherever it moves.

  • Pins tied to elements, not screen positions
  • Threads, replies, resolve and reopen
  • @mentions of your own people, and your page told whom to notify
  • A list of every thread, filtered and searched
  • Every change offered to your page first; read-only and moderator modes
  • Plain JSON in and out, saved wherever you keep your data
  • Platforms: Web — any framework or server stack, or plain HTML5 with no build step
In Hypernova Gold

Floor Plan – Desks and rooms, booked from the map

Desks, meeting rooms, seats, parking and lockers drawn where they really are, with their state now, chosen by pointer, keyboard or list and booked by your page.

  • Live states by colour and by pattern, and who has each place
  • Choose one or several, up to a limit; your page books them
  • Filters by kind, equipment, size and availability; zones and floors
  • Floor drawings as images or SVG, cleaned of anything that could run
  • Marked shapes in an SVG drawing imported as spaces
  • An editor with snapping and undo; live availability merged in
  • Platforms: Web — any framework or server stack, or plain HTML5 with no build step
The BMX floor plan of an office floor: desks in three team zones with booked desks hatched and their holders' initials, desks in use outlined red, a reserved desk dotted, your own desk marked, a desk and the Kingfisher meeting room chosen, and the list beside the map with Book 2
The BMX workflow designer showing an expense claim workflow: Employee, Manager, Finance and No role swimlanes, a start, a decision routing by amount, manager and finance reviews, fix and resubmit, and paid and rejected ends, with the condition =amount <= 1000 selected and edited in the panel
In Hypernova Gold

Workflow Designer and Engine – Approvals drawn, tried and run

Processes drawn in swimlanes by role, checked as they are drawn and simulated as each role, then run as task cards in your pages and by the same engine on your server.

  • Swimlanes by role, with approvals, decisions, waits and ends
  • Conditions written as formulas; who may take each action
  • Time limits that escalate; values and events as work moves
  • A live problems list, and Simulate as each role
  • Task cards showing each person what is theirs to do
  • The same engine as a module for Web Workers and Node
  • Platforms: Web — any framework or server stack, or plain HTML5 with no build step
In every web licence

Recurrence Editor – The “repeat” of a calendar, written as calendars read it

The repeat of a meeting, a report schedule or a maintenance window, chosen the way calendar programs offer it, and written as the iCalendar rule every calendar reads, or as cron for a job scheduler.

  • “The second Tuesday”, “the last weekday”, every n days, weeks, months or years
  • Ending never, after so many times or on a date
  • An iCalendar rule, or Unix or Quartz cron
  • The rule in words, and the next dates in the series’ own time zone
  • Dates skipped as exceptions; rules it cannot show kept as written
  • Goes into a form like any other field
  • Platforms: Web — any framework or server stack, or plain HTML5 with no build step
The BMX recurrence editor: a monthly database maintenance rule on the last Sunday, twelve times, in London time, with its iCalendar rule and the next five dates each with Skip, beside a Quartz cron job on weekdays at 2:30 with its next dates
The BMX JSON editor showing a billing service’s settings as a tree: the version and a replica count marked as changed, a new region marked as added, and a negative timeout flagged as a problem, with four changes counted against the published version
In Hypernova Pro and Gold

JSON Editor – One document, four views, checked as you edit

A tree, the text, a table and the changes against another version of one JSON document, checked against a JSON Schema as it is edited.

  • Tree, text, table and changes views of the same document
  • JSON Schema 2020-12 and draft-07, problems marked where they are
  • Titles, choices and defaults from the schema as you edit
  • Changes against another version, items matched by your key
  • Search and go to path; hundreds of thousands of values
  • Every edit offered to your page first; undo and redo
  • Platforms: Web — any framework or server stack, or plain HTML5 with no build step
In Hypernova Pro and Gold

Terminal – A terminal in the page, on your own connection

Shells, build and deploy consoles, device consoles and REPLs, in full colour, connected to whatever your page connects it to.

  • xterm-compatible: 24-bit colour, cursor movement, scroll regions, line drawing
  • The alternate screen of editors, pagers and monitors
  • write() in, keys and resizes out — WebSocket, SSH gateway or serial bridge
  • Floods of output read between frames; the page stays responsive
  • Search, copy, Ctrl+click links, light and dark schemes
  • A screen-reader mode, and Tab that can leave
  • Platforms: Web — any framework or server stack, or plain HTML5 with no build step
The BMX terminal as a deploy console: a coloured git log, passing test suites, a deployment with progress bars, a table of replicas and their status, and a health check link answering 200 OK, with the prompt and cursor at the bottom
The BMX data mapper turning shop orders into invoices: source fields on the left, invoice fields on the right, lines between them, the customer name worked out with a PROPER formula and its result for the first order, and the order items mapped to invoice lines
In Hypernova Gold

Data Mapper – One shape into another, drawn and run anywhere

How a shop’s order becomes your invoice, or a partner’s API becomes yours: two field trees and a line for every mapping, run by the same engine in the page and on your server.

  • Two field trees, from sample data or a JSON Schema
  • Spreadsheet formulas, lookup tables and defaults for any field
  • Lists made from lists, item by item, with a filter
  • Auto-map by name and synonym; problems as you go
  • A live preview over your sample records
  • Plain JSON maps, run in a worker or on Node
  • Platforms: Web — any framework or server stack, or plain HTML5 with no build step
In Hypernova Gold

3D Model Viewer – STL, OBJ and glTF, cut, pulled apart and measured

Models in the page, drawn with WebGL in the browser: turned and zoomed, cut by a section, pulled apart, measured and annotated, with nothing uploaded anywhere.

  • STL, OBJ, glTF and GLB, with colours, textures and the part tree
  • Standard views, perspective or orthographic, shaded, edges or X-ray
  • Sections with the cut faces filled, and an exploded view
  • A parts tree to show, hide, isolate and select
  • Measuring between points, and notes pinned to the surface
  • Full keyboard: Enter picks the point under the cross
  • Platforms: Web — any framework or server stack, or plain HTML5 with no build step
The BMX 3D model viewer showing a camera mount pulled apart in an exploded view: a blue base plate and uprights, a steel shaft, a highlighted camera plate, a brass knob and four bolts, two numbered note pins, and the parts tree with the camera plate selected
The BMX email template designer editing a coffee roaster’s autumn newsletter: the Add list of blocks and rows, the email with its banner, greeting with a merge field, text, a selected Shop button and three columns, and the button’s settings
In Hypernova Gold

Email Template Designer – Emails by drag and drop, sent as mail clients draw them

Newsletters, receipts and notices from rows, columns and blocks, exported as the HTML email clients really draw, with a plain-text part and checks before sending.

  • Rows of one to three columns, with headings, text, buttons, images and links
  • Drag, click or keyboard; undo and redo
  • Tables and inline styles; columns that stack on phones; Outlook looked after
  • Merge fields with fallbacks, filled with samples in the preview
  • A plain-text part, and checks before sending
  • Designs as plain JSON for your own database
  • Platforms: Web — any framework or server stack, or plain HTML5 with no build step
In Hypernova Gold

Planning Grid – Budgets and forecasts, with every total spread exactly

Accounts down the side, months, quarters and years across, and Budget, Forecast and Actual compared cell by cell — type a total and it is spread over the cells below it.

  • Totals typed and spread in proportion, evenly or by a seasonal profile
  • Held cells, closed months and signed-off rows left alone
  • Versions compared cell by cell, coloured by what is good news
  • Formula rows, what-if, comments and sign-off
  • Copy and paste with spreadsheets; every change handed to your page
  • Platforms: Web — any framework or server stack, or plain HTML5 with no build step
The BMX planning grid showing an operating plan in thousands: revenue, cost of sales and operating expense rows by month and quarter, the forecast against budget with green and red differences under each figure, the fourth quarter’s licences selected, and the details panel with the difference and a comment
The BMX configurator quoting an edge server in seller mode: chassis, processor, memory, graphics and power as option cards, a 1U chassis and a 64-core processor marked unavailable with the reasons, redundant power set by a rule, and the summary for six servers with a volume discount, a 12% discount needing approval and the bill of materials
In Hypernova Gold

Configurator – Configure, price, quote: every combination can be built

Choices as cards, lists or swatches, with rules that say what each requires, excludes or hides — and the price, discounts and bill of materials following every change.

  • Rules as spreadsheet formulas that keep every combination buildable
  • Unavailable options say why; choosing one shows what else changes
  • One-off and recurring prices, units and volume tiers
  • Seller mode: discount limits, approval and a bill of materials
  • The same engine on your server, so no quote is trusted as it arrives
  • Platforms: Web — any framework or server stack, or plain HTML5 with no build step
In Hypernova Gold

Document Compare – A redline of two versions, read in the page

Word, PDF, HTML, Markdown or text in any mix, lined up paragraph by paragraph and compared word by word — nothing uploaded.

  • Changes word by word, read as whole phrases
  • Moves as one change; formatting changes listed
  • Word headings, lists and tables; PDF paragraphs rebuilt
  • Side by side or inline; accept or reject each change
  • The redline, the clean copy and a CSV change report; bulk compare on a server
  • Platforms: Web — any framework or server stack, or plain HTML5 with no build step
The BMX document compare showing a mutual non-disclosure agreement as sent and as returned, side by side: a changed date, a deleted qualifier struck through, an added proviso underlined, an italic word and a new exception, with the list of changes, one accepted and one rejected
The BMX media player showing a safety induction video at its “On the floor” chapter: a caption on the picture, the scrub bar in four chapters with a thumbnail of a later chapter, and the controls for chapters, captions, transcript, bookmarks and settings
In Hypernova Pro and Gold

Media Player – Video and audio, captioned and searchable

Captions, subtitles, chapters and a transcript that follows along, for training, product tours, recorded meetings and podcasts.

  • Captions and subtitles in several languages, styled by the viewer
  • Chapters and thumbnails on the scrub bar
  • A transcript that follows along, searchable and downloadable
  • Bookmarks, speed, loops, full screen and picture-in-picture
  • Every control from the keyboard; descriptions read to screen readers
  • Platforms: Web — any framework or server stack, or plain HTML5 with no build step
The BMX caption editor with a safety induction: the video showing the chosen caption, its start and end times, text and reading-speed meter in the panel, and the timeline of captions over the sound’s waveform with the playhead
In Hypernova Gold

Caption Editor – Captions timed on the waveform, checked as you go

Captions and subtitles timed by dragging or by key, checked against reading-speed and line rules, and fixed in one step.

  • A timeline over the waveform with captions dragged into place
  • Split, merge, shift, re-sync and speakers
  • Rules for streaming, broadcast and education, or your own
  • Overlaps, short captions and long lines fixed in one step
  • Plain text turned into timed captions; WebVTT and SRT in and out
  • Platforms: Web — any framework or server stack, or plain HTML5 with no build step
The BMX risk matrix with an enterprise risk register on a five by five heat map: bands from low to critical, the appetite line, risks in their cells, an arrow from a ransomware risk’s inherent score through its residual to its target, and the risk’s details in the panel
In Hypernova Pro and Gold

Risk Matrix – A risk register on a heat map, with appetite and movement

Risks by likelihood and impact on your own scales, with bands, appetite, the treatment path and how each has moved since the last review.

  • Your own scales from 3 x 3 to 6 x 6, scored your way
  • Inherent, residual and target, with the arrows between them
  • Re-scored by dragging or with the keys; undo and redo
  • A register filtered by cell, band, category or owner
  • Overdue reviews and risks above appetite flagged; SVG for the board
  • Platforms: Web — any framework or server stack, or plain HTML5 with no build step
The BMX reconciliation workbench with a September bank reconciliation: totals, matched share and the unexplained difference along the top, the bank statement beside the cash ledger with items to review and their confidence, and a payment chosen by hand with a five-pound difference to record as an adjustment
In Hypernova Gold

Reconciliation Workbench – Two lists of money, matched and signed off

A bank statement against the ledger, or any two lists, matched by rules with a confidence, reviewed, adjusted and approved by a second person.

  • Six matching rules in order, one to one, one to many and many to many
  • Sure matches confirmed; the rest reviewed alone or together
  • Manual matching with suggestions and a running difference
  • Adjustments for fees and discounts; what is left aged
  • Submit and approve, every step logged; the engine on your server
  • Platforms: Web — any framework or server stack, or plain HTML5 with no build step
The BMX time-series explorer with a year of compressor readings: vibration with its anomalies marked and alert and trip lines, bearing and ambient temperatures, motor power, a cursor reading every series at once, the overview with the chosen window, and the window’s figures
In Hypernova Gold

Time-Series Explorer – Millions of points, drawn in milliseconds

Sensor readings, meters, metrics and prices in stacked panes, with every spike kept however far you zoom out.

  • A million points redrawn in a few milliseconds
  • Zoom, pan, pinch, an overview and quick ranges
  • Thresholds, events and anomalies marked
  • An earlier day, week or year drawn behind
  • Live data that follows the newest point; PNG and CSV out
  • Platforms: Web — any framework or server stack, or plain HTML5 with no build step
The BMX document signer with a tenancy agreement out for signing: the tenant’s progress and fields in the sidebar, her drawn signature, the date and her name filled in on the page, the landlord’s fields still waiting, and her telephone number typed in
In Hypernova Gold

Document Signer – PDFs signed in the page, with a signing certificate

Fields placed for each signer, signed in order, and the original PDF stamped with every value and a certificate of who signed when.

  • Signature, initials, date, name, text and checkbox fields, placed by mouse or keyboard
  • Signers in order, each guided field by field
  • Drawn or typed signatures, applied everywhere at once
  • The original PDF stamped, its bytes kept; SHA-256 on the certificate
  • Nothing leaves the page; stamping on your server too
  • Platforms: Web — any framework or server stack, or plain HTML5 with no build step
The BMX shift roster with two weeks of a care home: fifteen staff down the side and days across, early, late, long-day and night shifts in their colours, leave and requests hatched, a shift that breaks the rest rule outlined in red, each person’s hours, and the cover for each day along the bottom
In Hypernova Gold

Shift Roster – Who works when, with every rule checked

Shifts painted, typed or dragged into place, labour rules checked as you go, and auto-fill that explains every gap it could not fill.

  • Rest, weekly hours, days and nights in a row checked as you go
  • Skills, leave and requests not to work
  • Cover by skill, weekday or date, hour by hour
  • Auto-fill that keeps every rule and spreads hours fairly
  • Hours and cost per person; CSV and JSON out
  • Platforms: Web — any framework or server stack, or plain HTML5 with no build step
The BMX notification centre for a fictional supplier’s operations team: an inline activity feed with a pinned digest, a purchase order waiting for approval with Approve and Review buttons, three approved invoices stacked into one and a failed build, and the same inbox open from the bell with its unread count, tabs, source filter and search
In every web licence

Notification Center – The bell and the inbox, every application ends up building

An unread count on the bell and an inbox behind it, grouped by day, with repeats stacked, notifications pinned, snoozed or dismissed, and actions of their own.

  • Stacked, pinned, snoozed and dismissed, with up to three actions each
  • Tabs, a source filter, search and a Snoozed tab
  • Muting and stacking chosen by the reader
  • New ones announced to screen readers as they arrive
  • Every change handed to your page with the whole list
  • A panel from the bell, or in place as an activity feed
  • Platforms: Web — any framework or server stack, or plain HTML5 with no build step
In every web licence

Filter Panel – Faceted search for any list, counted the way good shops count

Checkboxes with live counts, ranges over a histogram, dates, ratings and switches, with chips, saved views and the choice kept in the address bar.

  • Counts that leave each facet’s own filter out, so one choice never zeroes the others
  • Number ranges over a histogram, dates with quick choices
  • A chip for everything chosen, Clear all and saved views
  • Filters your records itself, or hands a server the query
  • A side panel, or a bar of popups above a table
  • Folded behind “Filters (3)” on a phone
  • Platforms: Web — any framework or server stack, or plain HTML5 with no build step
The BMX filter panel over an office-equipment catalogue: chairs and desks between £150 and £800 in stock chosen, a chip for each choice and a saved view, the product types and brands with their live counts, and the seven matching products beside it
The BMX API explorer with a fictional trade counter’s Orders API: operations listed by tag with their methods, Find an order chosen with its order number filled in, and the mock response, 200 OK in 121 milliseconds and matching the documented schema, with the order’s JSON below
In Hypernova Pro and Gold

API Explorer – An OpenAPI console, in the page

Every operation of an OpenAPI 3 or Swagger 2 description documented and tried where it is read, with the response checked against its schema.

  • OpenAPI 3.0 and 3.1, JSON or YAML, and Swagger 2.0
  • Parameters, bodies, responses and schemas as tables of fields
  • Parameters checked as they are typed; credentials kept only in memory
  • Responses with status, time, headers and a schema check
  • Every request as cURL, JavaScript, C# and Python
  • A mock mode answering from the description’s own examples
  • Platforms: Web — any framework or server stack, or plain HTML5 with no build step
In Hypernova Pro and Gold

Mind Map – Built from the keyboard, as fast as you think

Enter for a topic beside, Ctrl+Enter for one under, or an indented outline kept in step beside the map, in four layouts that never overlap.

  • Both sides, to the right, downwards and radial, never overlapping
  • Branches in eight colours, folding with counts
  • Notes, links and icons on topics, in a details panel
  • Drag a branch to move it; reorder and indent by key
  • OPML, Markdown, JSON and text in and out
  • PNG and SVG pictures; a tree for screen readers
  • Platforms: Web — any framework or server stack, or plain HTML5 with no build step
The BMX mind map planning a fictional furniture maker’s spring range launch: the launch in the middle with Product, Suppliers, Marketing, Sales and Logistics branching both ways in their colours, the Spring catalogue topic chosen with its calendar icon, and its note, link, icon and branch colour in the details panel
The BMX process explorer with four hundred purchase orders at a fictional supplier: the figures along the top, from cases and variants to rework and the conforming share, the process map from requisition to payment with heavier paths for more orders and the change-order loop dashed, and Change purchase order chosen with where it comes from, where it goes and who does it
In Hypernova Gold

Process Explorer – How work really flows, from your own event logs

The process map discovered from the event log of an ERP, CRM, ticketing or workflow system, every case replayed, and every way it strays from the path it should follow.

  • The process map discovered, loops and hand-overs drawn, by frequency or by wait
  • Records, CSV, XES or JSON; columns found from the header
  • An animated replay of every case through the map
  • Variants ranked; each case with its timeline
  • Conformance: skipped, extra, repeated and out-of-order steps
  • Statistics and filters; SVG, PNG, CSV and JSON out
  • Platforms: Web — any framework or server stack, or plain HTML5 with no build step
In Hypernova Gold

Trace Viewer – Where the time went,, span by span

A distributed trace from OpenTelemetry, Zipkin or Jaeger as a timeline in its call tree, with the critical path that decided how long the request took.

  • The critical path marked, with each span’s self time and time on the path
  • Every span on one axis, coloured by service, failures marked
  • A flame graph, and figures by service and operation
  • The service map: who calls whom, how often, with errors
  • Two runs compared span by span
  • Tens of thousands of spans; CSV, OpenTelemetry JSON and SVG out
  • Platforms: Web — any framework or server stack, or plain HTML5 with no build step
The BMX trace viewer with a slow checkout at a fictional shop: 1.64 seconds across twelve services and twenty-one spans, the timeline with each span coloured by service, a failed card authorisation marked and retried, the critical path underlined, and where the time went listed beside it
The BMX lineage graph focused on a fictional shop’s customers table: the email column chosen and traced through the staging and customer models to the Customer 360 dashboard and a marketing audience, every PII column highlighted, and the column’s classification and where it goes in the panel
In Hypernova Gold

Lineage Graph – Where data comes from and goes,, down to the column

OpenLineage events or a dbt manifest laid out from sources to dashboards, with column lineage, impact analysis and PII carried downstream wherever it lands.

  • Column lineage traced both ways, with the transformation at each step
  • Everything upstream and downstream of an asset, lit up
  • Impact analysis: what a change reaches, and the owners to tell
  • PII and other classifications carried downstream
  • Focus by hops, search, an assets table and checks
  • SVG, CSV and JSON out, and the engine for CI checks
  • Platforms: Web — any framework or server stack, or plain HTML5 with no build step
In Hypernova Pro and Gold

Dock Layout – The workspace of an IDE or a trading desk, in one element

Your own panels in tabbed groups, dragged onto guides to dock, float, fold to an edge or maximise, and arranged the same way from the keyboard.

  • Dock guides as you drag, into a group, onto a side or to an edge
  • Floating windows that move, resize and dock back
  • Groups folded to an edge, maximised, closed and reopened
  • Panels keep their state wherever they go
  • Layouts as plain JSON, kept per user or in the browser
  • Every move from the keyboard, announced
  • Platforms: Web — any framework or server stack, or plain HTML5 with no build step
The BMX dock layout as a fictional furniture maker’s dispatch desk: the orders list, an order’s details and the activity log docked side by side, Notes and Problems tabbed below the details, and a Shortcuts panel floating over them with its keyboard help
In Hypernova Pro and Gold

Panorama Viewer – 360-degree pictures and virtual tours, room to room

Panoramas from phones, 360 cameras and renderers, drawn by the graphics card and joined into tours with hotspots and a floor plan.

  • Drag, keys or a moving phone to look around; wheel and pinch to zoom
  • Hotspots from room to room, facing the right way
  • A floor plan with where you stand and which way you face
  • A strip of scenes, a compass and full screen
  • A tour editor in the page, saved as JSON
  • Tab reaches every hotspot; the direction faced announced
  • Platforms: Web — any framework or server stack, or plain HTML5 with no build step
The BMX panorama viewer touring a fictional show home: the lounge in 360 degrees looking out through the patio doors, hotspots to the garden and the kitchen, the floor plan in the corner showing where the viewer stands and faces, and a strip of the three rooms below
The BMX label designer with a fictional supplier’s express shipping label: the sender, the recipient’s address and postcode in large type, a QR code, the tracking barcode chosen with its handles, and an SSCC barcode, with the barcode’s symbology, field and position in the properties panel
In Hypernova Gold

Label Designer – Labels designed in the page, printed on sheets or thermal rolls

Shipping, product and shelf labels, asset tags and badges, with barcodes sized to whole printer dots and fields filled from your data.

  • Ten barcode types, QR to GS1-128, sized so what is designed scans
  • Text that wraps or shrinks to fit; pictures, boxes and lines
  • Fields, serial numbers and print-only-when
  • CSV and JSON data, stepped through record by record
  • Sixteen sheet and roll stocks, or your own
  • Printed at real size; PDF, ZPL, PNG and SVG out
  • Platforms: Web — any framework or server stack, or plain HTML5 with no build step
In Hypernova Gold

Data Profiler – What is in every column, and what is wrong with it

A CSV, JSON or Excel file described column by column, scored for quality, checked against rules and compared with the last extract.

  • Every column’s type, statistics and outliers, with the rows they are in
  • Emails, phones, cards and IBANs checked; personal data flagged
  • A quality score and every problem ranked
  • Correlations and missing values as heatmaps
  • Rules suggested from the data, then checked
  • Drift against an earlier extract; an HTML report out
  • Platforms: Web — any framework or server stack, or plain HTML5 with no build step
The BMX data profiler with a fictional shop’s September orders: a quality score of 98 with completeness, validity, uniqueness and consistency, the counts of rows, columns, missing cells, duplicates and personal data, the column types, and the alerts ranked from a mostly missing notes column to dates in the future and a city spelt seven ways
The BMX driver tree for a fictional retailer’s operating profit: the result broken into gross profit and operating costs, then net sales, gross margin, orders, order value, return rate, fulfilment and fixed costs, each card with its value and its change against plan in green or red, and the operating profit’s formula and scenarios in the panel
In Hypernova Gold

Driver Tree – Every driver of a number, and what happens if one moves

A result broken into the levers people pull, recalculated as a slider moves, with scenarios, goal seek, sensitivity and a bridge from plan to actual.

  • Each driver with its value and change, coloured by which way is better
  • What-if sliders, saved as scenarios
  • Goal seek within each input’s range
  • A sensitivity tornado chart
  • A plan-to-actual bridge that always adds up
  • Formulas in plain words; JSON, CSV and SVG out
  • Platforms: Web — any framework or server stack, or plain HTML5 with no build step
In Hypernova Gold

Audio Editor – A multitrack editor that also takes card numbers out of calls

Clips cut, moved, faded and mixed on tracks, loudness set to the broadcast targets, and card details and keypad tones found and bleeped.

  • WAV, MP3, AAC, Ogg and FLAC as clips on tracks, the originals never changed
  • Cut, trim, move, fade, undo; mute, solo, volume and pan
  • Card numbers, bank details and more found from a transcript
  • Keypad tones heard and bleeped on every track
  • Loudness measured and set; silence found and removed
  • WAV with markers out; nothing leaves the page
  • Platforms: Web — any framework or server stack, or plain HTML5 with no build step
The BMX audio editor with a fictional card payment call: the agent and caller on two tracks, six stretches hatched red where a postcode, a phone number, the card details and the keypad tones have been bleeped, and the six findings listed with their times in the Redact panel
The BMX seat map for a fictional playhouse: the stage, curved stalls and a dress circle in price-zone colours with sold seats greyed, two seats chosen in the stalls, and the summary beside it with the hold’s countdown, ticket types, a booking fee and the total
In Hypernova Pro and Gold

Seat Map – Seats chosen, held and priced, from a theatre to an arena

Sections and curved rows from a compact layout, price zones, ticket types and fees, holds on your own server, and an editor for the venue.

  • Theatres, arenas, cinemas and cabins, twenty thousand seats drawn smoothly
  • Price zones, ticket types, booking fees and the total
  • Wheelchair spaces with their companion seats
  • Best seats together; no single seat stranded
  • Your server holds each seat, with a countdown
  • An editor to lay the venue out and check it
  • Platforms: Web — any framework or server stack, or plain HTML5 with no build step
In Hypernova Pro and Gold

Mail Viewer – Received email opened in your page, shown safely

.eml, Outlook .msg and .mbox folders, with attachments, forwarded messages, conversations and search.

  • .eml, Outlook .msg and .mbox, read in the browser
  • Shown in a sealed frame where no script runs
  • Pictures from the internet held back until asked
  • Attachments opened and saved; forwarded messages inside
  • Conversations and search across a mailbox
  • The readers on your server for archives
  • Platforms: Web — any framework or server stack, or plain HTML5 with no build step
The BMX mail viewer with a fictional design studio’s mailbox: the messages listed newest first, and a newsletter open with its banner, the notice that a picture from the internet was held back, and its button
The BMX presentation editor with a fictional design review: the slides down the side, a stacked column chart of hours by stage on the slide, and the speaker notes beneath it
In Hypernova Gold

Presentation Editor – PowerPoint files in your page, edited and presented

Masters, themes, tables and charts with their data, transitions and builds, a slide show with presenter view, and PDF out.

  • PowerPoint files opened and saved, untouched parts kept exactly
  • Text, shapes, tables, pictures and charts edited in place
  • Charts kept editable with PowerPoint’s Edit Data
  • Transitions and builds; the slide sorter
  • A slide show with presenter view and timer
  • Decks made from your data, in your design
  • Platforms: Web — any framework or server stack, or plain HTML5 with no build step
In Hypernova Gold

Video Editor – A timeline in your page, exported to MP4 by the browser

Video, pictures, titles and sound on tracks, transitions, animated titles and captions, and MP4 or WebM made with nothing uploaded.

  • Video, picture, title and sound tracks, trimmed, split and rippled
  • Speed, volume, fades and crop on every clip
  • Transitions, animated titles and captions
  • A frame-accurate preview with J, K and L
  • MP4 or WebM in 16:9, 9:16 or square
  • Projects as JSON your page keeps
  • Platforms: Web — any framework or server stack, or plain HTML5 with no build step
The BMX video editor with a fictional café’s teaser: the media list, the preview, and the timeline with a titles track, clips with transitions, a music bed’s waveform and captions
The BMX PCB viewer with a fictional two-layer sensor board shown as it will be made: green solder mask, gold pads, white silkscreen and mounting holes, with the board look and layer list beside it
In Hypernova Gold

PCB Viewer – Gerber and drill files, as the board will be made

The board from the top or the bottom, or as layers, with nets, parts and pins, measuring, notes, and PDF to scale.

  • Gerber X2 and Excellon, or a design tool’s ZIP
  • Solder mask colours, gold or tin, silkscreen and holes
  • Nets lit up; parts and pins found by name
  • Distances measured between pads
  • Notes pinned to the board, kept as JSON
  • SVG, PNG and PDF; the readers on your server
  • Platforms: Web — any framework or server stack, or plain HTML5 with no build step
In Hypernova Gold

Deep Zoom Viewer – Gigapixel pictures in your page, smooth at any size

Slide scans, maps and artwork from Deep Zoom, IIIF, Zoomify or TIFF, compared, annotated and measured in real units.

  • Deep Zoom, IIIF, Zoomify and TIFF, slide scans included
  • Only what is on screen read, at any size
  • Two pictures side by side or with a swipe
  • Annotations as JSON or GeoJSON (QuPath’s form)
  • Measured in real units, with a scale bar
  • The view or a region at full detail as PNG
  • Platforms: Web — any framework or server stack, or plain HTML5 with no build step
The BMX deep zoom viewer showing the Mandelbrot set at over 800 gigapixels with its places marked and labelled, a scale bar, the overview map in the corner, and the picture’s details beside it
The BMX sequence viewer with a made-up plasmid: the circular map with genes, promoters and the origin as coloured arrows, restriction enzymes named round the ring, the multiple cloning site chosen, and the feature list beside it
In Hypernova Gold

Sequence Viewer – DNA, RNA and protein, for research

Plasmid and linear maps, translations, digests, primers, motifs and multiple alignments from FASTA, GenBank, SnapGene and more.

  • FASTA, GenBank, EMBL and SnapGene, read in the browser
  • Circular and linear maps with labelled features
  • Ninety-two restriction enzymes; digests on a gel
  • Six-frame translations and open reading frames
  • Melting temperature, weight and protein figures
  • Multiple alignments with conservation and identity
  • Platforms: Web — any framework or server stack, or plain HTML5 with no build step
In Hypernova Pro and Gold

XML Editor – XML checked against its schema, as you type

Text or tree, every rule a document breaks shown where it breaks, completion from the schema, XPath, compare and canonical XML.

  • Text or tree, edits that keep the file’s layout
  • XML Schema 1.0, problems in plain words on the line
  • Completion of what the schema allows at the caret
  • XPath 1.0 with every match stepped through
  • Compare, format, minify and canonical XML
  • The same checks and XPath on your server
  • Platforms: Web — any framework or server stack, or plain HTML5 with no build step
The BMX XML editor with a made-up stationery order from a fictional studio: the XML coloured in the text view, an XPath bar listing the two lines over five boxes, and a quantity of 0 underlined as breaking the order schema, with one problem shown in the toolbar
The BMX translation editor with a made-up booking app’s strings in Polish: the string list with each one’s state, a plural string chosen with its source, the Polish fields for one, few and many, and the memory, terms and checks below
In Hypernova Pro and Gold

Translation Editor – Your app’s strings translated, placeholders kept safe

XLIFF, PO, String Catalogs, Android, Apple, JSON, ARB and .resx, saved in their own format, with memory, a glossary and checks.

  • Eight file formats, saved with only the translations changed
  • Placeholders and tags that cannot be broken
  • A field for each plural form; ICU messages previewed
  • Translation memory from TMX, a glossary from TBX or CSV
  • Checks as you type, review states and progress
  • The same checks in your build
  • Platforms: Web — any framework or server stack, or plain HTML5 with no build step
In Hypernova Gold

EDI Editor – EDIFACT and X12, read, checked and acknowledged

Interchanges as a tree of segments, checked against your partners’ guides, corrected with the counts put right, and acknowledged.

  • UN/EDIFACT, ANSI X12 and TRADACOMS, read in the browser
  • Each element by name, code meaning and format
  • Envelopes checked; messages against your own guides
  • Edits that keep the file, control counts put right
  • CONTRL, 997, 999 and TA1 acknowledgements
  • JSON and XML out, and the engine on your server
  • Platforms: Web — any framework or server stack, or plain HTML5 with no build step
The BMX EDI editor with a made-up EDIFACT order interchange: the tree of envelopes, parties and order lines with two problems flagged, and the chosen quantity’s elements laid out by name, its value “two” outlined as not a number
The BMX XBRL viewer with a fictional studio’s annual accounts: the balance sheet as it was laid out with every tagged figure lit up, total assets chosen, and its concept, value, period, entity, unit and balance beside it
In Hypernova Gold

XBRL Viewer – Financial filings, figure by figure

Inline XBRL filings shown as they were laid out, every tagged figure lit up, inspected and checked.

  • Inline XBRL and report packages, read in the browser
  • Every tagged figure lit up on the page
  • Concept, period, entity, dimensions and unit
  • A fact table to filter and search
  • The presentation outline and calculation checks
  • xBRL-JSON and CSV out
  • Platforms: Web — any framework or server stack, or plain HTML5 with no build step
In Hypernova Gold

Point Cloud Viewer – Laser scans in your page, measured and cut

LAS, LAZ, PLY and more, millions of points moved through smoothly, coloured, measured, profiled and clipped.

  • LAS and LAZ, PLY, PCD, XYZ and PTS, read in the browser
  • Millions of points within a point budget you set
  • Colour by RGB, intensity, elevation, class or return
  • Distances, heights and areas by picking points
  • Profiles, clipping boxes, notes and saved views
  • Survey coordinates kept to the millimetre
  • Platforms: Web — any framework or server stack, or plain HTML5 with no build step
The BMX point cloud viewer with a made-up quarry survey of 180,000 points coloured by elevation: the quarry floor, benches cut into one side, a stockpile, a shed and trees, two notes pinned, and the file’s details beside it
The BMX rack designer with a fictional comms room: the device catalog, two 42U racks with switches, servers and storage in their units and the power bars above them, and the chosen database server’s details beside them
In Hypernova Gold

Rack Designer – Racks planned with their space, power, cables and heat

Elevations from your own catalog, PDUs with A and B feeds, cables traced end to end, and everything wrong listed.

  • Front and rear elevations, devices from your own catalog
  • PDUs with outlets, phases and A and B feeds
  • Power per phase, normal and with a feed lost
  • Cables traced end to end through patch panels
  • Space, weight and heat; every problem listed
  • JSON, CSV, SVG and a printable PDF
  • Platforms: Web — any framework or server stack, or plain HTML5 with no build step
In Hypernova Gold

Route Planner – Deliveries planned within every window and capacity

Depots, stops and vehicles, routes optimised on a background thread, and stops dragged between routes with the cost as you drag.

  • Time windows, capacities and shifts, skills and breaks
  • Optimised on a background thread, within every limit
  • Routes over your own map; each vehicle’s day
  • Stops dragged between routes, costs shown as you drag
  • Your own distance table, or a straight line and a road factor
  • JSON, CSV and printable driver sheets
  • Platforms: Web — any framework or server stack, or plain HTML5 with no build step
The BMX route planner with a fictional market town’s deliveries: four routes in colour from the depot through numbered stops over a made-up map, and each van’s stops with their arrival times, distance and cost
The BMX YAML editor with a made-up shop’s deployment file: the YAML coloured in the text view, a second document below the first, and one problem against its schema counted in the toolbar
In Hypernova Pro and Gold

YAML Editor – Configuration files checked, comments and all kept

YAML, TOML, INI, .properties and .env as text or a tree, each document checked against its JSON Schema as you type.

  • Text or tree, edits that keep comments and layout
  • JSON Schema checks, one schema per document if you like
  • Completion of keys and values from the schema
  • Anchors, aliases and merge keys shown for what they are
  • Convert between formats; compare with another version
  • The same checks in your build or on your server
  • Platforms: Web — any framework or server stack, or plain HTML5 with no build step
In Hypernova Pro and Gold

BOM Editor – Bills of materials rolled up as you type

A multi-level BOM as an indented tree grid, with cost, weight and lead time rolled up, parts lists, where-used and revisions compared.

  • An indented tree grid, quick with tens of thousands of lines
  • Each part once; a change shows everywhere it is used
  • Cost, weight and lead time for any build quantity
  • Parts lists and where-used, with replace everywhere
  • Revisions compared: structure, quantities and cost
  • CSV and JSON in and out; printable PDFs
  • Platforms: Web — any framework or server stack, or plain HTML5 with no build step
The BMX BOM editor with a made-up e-bike’s bill of materials at revision D: the indented structure of assemblies and parts with their quantities and unit costs, rolled up for a batch of 25
The BMX chemical structure editor with penicillin G opened from a list of ten compounds: the structure drawn with its stereocentres labelled, and its formula, molecular weight and SMILES beside it
In Hypernova Gold

Chemical Structure Editor – Structures drawn, checked and registered

Draw with the mouse or the keyboard, read and write molfiles, SD files and SMILES, and search a compound list by substructure.

  • Atoms, bonds, rings and templates, groups as their abbreviations
  • Formula, molecular weight and masses as you draw
  • R/S and E/Z by the Cahn-Ingold-Prelog rules
  • Canonical SMILES for registration and duplicates
  • Reactions, and substructure search across an SD file
  • The same engines on your server
  • Platforms: Web — any framework or server stack, or plain HTML5 with no build step
In Hypernova Gold

Load Planner – Containers and trailers loaded drop by drop, in 3D

Items with their sizes, weights and rules packed on a background thread, each stop’s cargo loaded to come off first.

  • Containers, trailers, vans and pallets, or your own spaces
  • Turning, stacking and load-bearing rules kept
  • Delivery stops loaded so each comes off first
  • 3D, top, side and door views in loading order
  • Centre of gravity and axle loads checked
  • Printable loading instructions with boxes to tick
  • Platforms: Web — any framework or server stack, or plain HTML5 with no build step
The BMX load planner with a made-up order in a 40 ft high cube container: pallets, cartons and drums packed in 3D and coloured by item, and the cargo list with each item’s size beside it
The BMX geo editor with a made-up farm’s field boundaries: polygons over a plain background of lanes and a brook, and the attribute table with each field’s name, crop and survey date beneath
In Hypernova Gold

Geo Editor – Map features drawn and checked for overlaps and gaps

Points, lines and polygons with their attributes, areas on the ellipsoid, and Shapefile, GeoJSON, KML, GPX and CSV in and out.

  • Drawing with snapping, holes, parts and the keyboard
  • An attribute table in step with the map
  • Split, reshape, merge, buffer and simplify
  • Overlaps, gaps and self-crossings found and fixed
  • Coordinates kept in their own system
  • No map tiles fetched; your own background layers
  • Platforms: Web — any framework or server stack, or plain HTML5 with no build step
In Hypernova Gold

SBOM Viewer – Every licence judged against your own policy

CycloneDX and SPDX as a table, a tree and a graph, with the NTIA checks, vulnerabilities from your own files and releases compared.

  • CycloneDX and SPDX, converted one to the other
  • Licence expressions against allowed, review and denied lists
  • Checks against the NTIA minimum elements
  • Vulnerabilities from your VEX and OSV files, nothing looked up
  • CVSS scores worked out from the vectors
  • Releases compared; CSV and a PDF report
  • Platforms: Web — any framework or server stack, or plain HTML5 with no build step
The BMX SBOM viewer with a made-up product’s software bill of materials: the dependency graph coloured by licence policy, and one component chosen with its denied licence and its vulnerability beside it
The BMX text annotator with made-up product reviews: labelled spans as coloured bars under the text, a relation drawn as an arc, dashed suggestions with their confidence, and the document’s classes beside it
In Hypernova Gold

Text Annotator – Text labelled for language models, from the keyboard

Spans, relations and classes against your schema, your model’s suggestions to accept, and several annotators’ agreement.

  • Nested and overlapping spans, relations drawn as arcs
  • Your model’s suggestions, accepted above a threshold
  • Right-to-left and character-by-character scripts
  • Cohen’s and Fleiss’ kappa, span F1, adjudication
  • A review mode with notes for the annotators
  • JSONL, CoNLL, BRAT and spaCy in and out
  • Platforms: Web — any framework or server stack, or plain HTML5 with no build step
In Hypernova Pro and Gold

SQL Editor – SQL read as each database reads it, checked as you type

Six dialects checked against your schema, completed and formatted, run through your own connection, with query plans read and compared.

  • Six SQL dialects, PostgreSQL to SQLite
  • Unknown columns, missing WHERE and more, with fixes
  • Completion from your own schema
  • A formatter in your house style
  • Results, history and snippets
  • Query plans as a tree, hot spots marked
  • Platforms: Web — any framework or server stack, or plain HTML5 with no build step
The BMX SQL editor with a made-up cycle hire firm’s takings query: the SQL coloured and checked against its schema, and the results grid below it
The BMX PDF organiser with a made-up tenancy pack: page thumbnails from three files, one page turned, and the stamps panel beside them
In Hypernova Pro and Gold

PDF Organiser – PDF pages put together in your page

Merge, reorder, turn and delete pages, number and stamp them, split them and add a password, with nothing uploaded.

  • Thumbnails of every page, drawn by our own engine
  • Merge, reorder, turn, delete and insert
  • Page numbers, headers, footers and stamps
  • Split by ranges, bookmarks or size
  • Title, author, keywords and bookmarks
  • AES-256 passwords with permissions
  • Platforms: Web — any framework or server stack, or plain HTML5 with no build step
In Hypernova Gold

Threat Modeller – Threat models drawn, scored and compared

Data-flow diagrams with trust boundaries, STRIDE threats suggested by built-in rules and your own library, and risks on your own matrix.

  • Data-flow diagrams, with trust boundaries
  • STRIDE threats suggested as you draw
  • Status, mitigation, owner and risk
  • Gaps in the model listed
  • Two versions compared; a PDF report
  • JSON and Threat Dragon files
  • Platforms: Web — any framework or server stack, or plain HTML5 with no build step
The BMX threat modeller with a made-up council’s parking permit service: the data-flow diagram with its trust boundaries, and the threats with their status and risk beside it
The BMX profile viewer with a made-up order service’s CPU profile: a flame graph with the hottest function chosen, and the function table beside it
In Hypernova Gold

Profile Viewer – Where a program's time went, at a glance

V8, trace event and pprof profiles as flame graphs, call trees and tables, one slow request picked out, and two runs compared.

  • Flame graph, icicle and call tree, in step
  • Callers and callees of any function
  • Threads and a timeline to pick one stretch
  • CPU time, samples and memory
  • Two profiles compared, function by function
  • SVG and collapsed stacks out
  • Platforms: Web — any framework or server stack, or plain HTML5 with no build step
The BMX ladder editor with a made-up lift station’s program running: power flow drawn on the rungs, a pump block with its pins, and the watch list beside it
In Hypernova Gold

Ladder Editor – PLC ladder logic, simulated in your page

Rungs, timers, counters and function blocks edited from the keyboard, checked as you work, and run scan by scan beside an HMI panel.

  • Contacts, coils, timers and counters, and your own blocks
  • Tag table, cross-reference and checks
  • The program as structured text
  • A scan-by-scan simulator with forcing
  • Linked to the BMX HMI panel
  • JSON, PLCopen XML and PDF
  • Platforms: Web — any framework or server stack, or plain HTML5 with no build step
In Hypernova Gold

Plate Designer – Microplates laid out, read and fitted

Plates of 6 to 1536 wells, reader exports as heat maps with the Z'-factor, and dose-response curves with IC50s and their intervals.

  • Dilution series and replicates, randomised with a seed
  • Plate reader exports as heat maps
  • Z'-factor, signal to background and CVs
  • Four- and five-parameter curve fits
  • IC50 and EC50 with confidence intervals
  • Worklists, CSV and a PDF report
  • Platforms: Web — any framework or server stack, or plain HTML5 with no build step
The BMX plate designer with a made-up kinase screen: four compounds’ dose-response curves with their IC50s marked, and the plate’s quality beside them
The BMX Markdown editor with made-up release notes: the Markdown coloured on the left and the preview with its table on the right
New — in Hypernova Pro and Gold

Markdown Editor – Markdown written and seen side by side

The text, a live preview or both, kept in step, with checks for what readers would trip over, and safe HTML, Word and PDF out.

  • Text, preview or both, kept in step as either scrolls
  • Tables, task lists, footnotes and front matter
  • A toolbar, the usual keys and a table menu
  • Checks and an outline
  • Pictures through your own upload function
  • Safe HTML, Word and tagged PDF out
  • Platforms: Web — any framework or server stack, or plain HTML5 with no build step
New — in Hypernova Pro and Gold

PDF Form Filler – PDF forms filled and checked in your page

Every field where the form puts it, formats and calculations applied by our own rules, and plain PDFs made fillable, with nothing uploaded.

  • Text, check, radio, list and signature fields, drawn by our own engine
  • Formats, ranges, required fields and calculations
  • The form’s scripts never run
  • Saved fillable, or flattened
  • JSON and FDF in and out
  • Plain PDFs made fillable
  • Platforms: Web — any framework or server stack, or plain HTML5 with no build step
The BMX PDF form filler with a made-up equipment loan request: the form’s fields filled in on the page, and the list of fields beside it
The BMX notebook with a made-up orders analysis run: a table of totals by region worked out in JavaScript, and its column chart
New — in Hypernova Gold

Notebook – Data notebooks with Markdown, JavaScript and SQL

Code run in a sandbox, SQL through your own connection with its values as parameters, and results as tables and charts.

  • Markdown, JavaScript and SQL cells, run one by one or all
  • JavaScript in a sandbox with no page and no network
  • SQL through your own function
  • Tables, charts, Markdown and pictures
  • Outline, variables and parameters
  • .ipynb in and out; web page and PDF
  • Platforms: Web — any framework or server stack, or plain HTML5 with no build step
New — in Hypernova Gold

Record Matcher – Duplicate records found and merged

Names, firms, e-mail addresses, phones and dates compared, pairs weighed and reviewed side by side, and golden records made by rule.

  • Comparators for names, firms and phones, e-mail, codes and dates
  • Blocking keys, on a background thread
  • Fellegi-Sunter weights, set or learned
  • Review side by side, from the keyboard
  • Golden records by survivorship rules
  • An audit trail; CSV and JSON
  • Platforms: Web — any framework or server stack, or plain HTML5 with no build step
The BMX record matcher with a made-up customer list from three systems: a pair up for review, side by side, with each field’s similarity and weight
The BMX PDF redactor with a made-up letter: names and personal details found and marked on the page, and the list of marks with their reasons beside it
New — in Hypernova Gold

PDF Redactor – True redaction, checked

What lies under each mark taken out - text, drawings and pixels - found by words and patterns, reviewed with reasons, and the result checked.

  • Marks drawn, dragged over text or put over whole pages
  • Words, regular expressions and patterns found
  • Reasons and exemption codes of your own
  • Text, drawings and pixels taken out
  • Metadata, attachments and scripts cleaned
  • The result checked; a log kept
  • Platforms: Web — any framework or server stack, or plain HTML5 with no build step
New — in Hypernova Gold

Spectrum Viewer – Spectra read, labelled and integrated

NMR, infrared, UV-Vis and mass spectra from JCAMP-DX files, with peaks, integrals, processing and search against your own library.

  • NMR, IR, Raman, UV-Vis and mass spectra, each axis in its usual units
  • JCAMP-DX in every compressed form
  • Overlay or stack
  • Smoothing and baseline correction
  • Peaks labelled; integrals against a reference
  • Search against your own library
  • Platforms: Web — any framework or server stack, or plain HTML5 with no build step
The BMX spectrum viewer with a made-up proton NMR spectrum: the peaks labelled in ppm and three integrals with their running curves
The BMX requirements tracer with a made-up room thermostat: system requirements under headings with their coverage, and one item open with its links
New — in Hypernova Gold

Requirements Tracer – Requirements traced to design, tests and risks

Documents of numbered items linked and covered against your own rules, with suspect links, the reach of a change and baselines compared.

  • Documents of numbered items, with attributes of your own
  • Typed links, from the item or the trace matrix
  • Coverage against rules of your own
  • Suspect links when either end changes
  • Baselines compared and gone back to
  • JSON, CSV and Excel; a PDF report
  • Platforms: Web — any framework or server stack, or plain HTML5 with no build step
The BMX timesheet with a fictional consultant’s week: six lines of client work, support, a bid and annual leave across Monday to Sunday, today’s column marked, a support entry flagged for a missing note, and the totals against the expected hours
In Hypernova Pro and Gold

Timesheet – Time typed the way people say it, checked as they go

Projects, tasks and leave across a week or a fortnight, times typed as 7:30, 7.5 or 9-17:30, and a sheet taken from draft to approved.

  • Times typed as they are said, rounded to your increment
  • Timers that book to the day they started
  • Totals against each day’s expected hours, with overtime
  • Your rules checked as people type, one click from the day
  • Draft, submitted, approved and rejected, with the trail
  • CSV and JSON out; one day at a time on a phone
  • Platforms: Web — any framework or server stack, or plain HTML5 with no build step
In Hypernova Pro and Gold

Booking Picker – What your customers book with, in their own time zone

A service, who with or anyone, a day and a free time worked out from working hours, buffers and what is already taken.

  • Free times worked out in the page from hours, days off, buffers and notice
  • Times in the customer’s zone, whatever zone your people work in
  • Classes with places, and a waiting list for a full day
  • Moving and cancelling from the same element
  • A reference and a calendar file for every booking
  • Your page answers each request; the picker keeps nothing
  • Platforms: Web — any framework or server stack, or plain HTML5 with no build step
The BMX booking picker for a fictional physiotherapy clinic: Wednesday 21 October chosen on the month calendar, its free times from morning to evening with 09:30 chosen, and the booking so far beside them
The BMX document editor with a fictional consultancy’s proposal on an A4 page: a title, a table of contents with page numbers, a tracked change from nine to ten months, a highlighted comment, and the reviewer’s comment and changes in the pane beside the page
In Hypernova Gold

Document Editor – A word processor in your page, with Word documents in and out

Laid out on real pages, with tracked changes, comments, a table of contents, footnotes and mail merge, and .docx opened and saved in the browser.

  • Real pages with headers, footers and page numbers
  • Styles, lists, tables, pictures and tab stops
  • Tracked changes and comments, accepted and answered
  • Mail merge, previewed and merged into one document
  • Word documents opened and saved; PDF out
  • The engine on your server for documents in bulk
  • Platforms: Web — any framework or server stack, or plain HTML5 with no build step
In Hypernova Gold

Document Scanner – The camera as a scanner, pages found and straightened

The page outlined as its edges are found and taken by itself when still, straightened, cleaned up, and saved as one PDF.

  • Edges found as you hold it, and the page taken when still
  • Photographs added, dropped or pasted too
  • Straightened from four corners, with a magnifier
  • Colour, greyscale or crisp black and white
  • One PDF, a ZIP of JPEGs or a single picture
  • Every picture processed in the page
  • Platforms: Web — any framework or server stack, or plain HTML5 with no build step
The BMX document scanner with a photographed café receipt lying at an angle on a wooden desk, its four corners found and outlined in green, and an invoice and the receipt as pages in the list beside it
The BMX trading chart with two years of an invented share’s daily candles, a fifty-day average, Bollinger Bands, a trend line and a Fibonacci retracement over the price, volume beneath, and an RSI pane
In Hypernova Gold

Trading Chart – Candles, fifty-nine indicators, replay and an order book

A price chart for brokerage, wealth and research applications, with drawings anchored to the bars and live ticks into the forming bar.

  • Candles, Heikin-Ashi, Renko and more, on a market-hours axis
  • Fifty-nine indicators, each with its settings
  • Trend lines, channels and Fibonacci, anchored to the bars
  • Comparisons in per cent, and bar replay
  • An order book ladder and a depth chart
  • The engine on your server for screens and books
  • Platforms: Web — any framework or server stack, or plain HTML5 with no build step
In Hypernova Gold

HMI Panel – Plant displays with live tags and ISA-18.2 alarms

Thirty-three symbols in the high-performance style, bound to your own feed, with faceplates, an alarm list and an editor built in.

  • Tanks, pumps, valves and switchgear in the ISA-101 style
  • Live values from OPC UA, MQTT or anything else
  • Faceplates with a trend and confirmed commands
  • Alarms with deadband, delay, priorities and shelving
  • A view-only mode for those who watch
  • An editor to draw and change displays, saved as JSON
  • Platforms: Web — any framework or server stack, or plain HTML5 with no build step
The BMX HMI panel with a fictional booster pumping station: a raw water tank, two pumps with P-101 tripped and flagged, a control valve, a treated water tank, a pressure dial and two mini trends, and the trip listed as a critical alarm beneath
The BMX CAD viewer with a fictional flat’s floor plan on a dark ground: walls with their hatching, doors and windows, furniture, floor patterns, room names with their areas and red dimensions, and the twelve layers listed with their colours beside it
In Hypernova Gold

CAD Viewer – DXF drawings in your page, measured and marked up

Layers, blocks, hatches and dimensions in their colours, paper layouts with their viewports, and PNG, SVG or PDF out.

  • DXF of any version, read and drawn in the browser
  • Layers switched on and off, with their colours
  • Layouts with viewports at their own scales
  • Distances, areas and angles measured with snaps
  • Clouds, arrows and notes kept as JSON
  • PNG, SVG and vector PDF; the engine on your server
  • Platforms: Web — any framework or server stack, or plain HTML5 with no build step
The BMX annotation studio labelling a street scene: the queue of frames with their statuses, the road as a painted mask, trees as polygons, cars as boxes, a person as a keypoint skeleton, a parked car’s rotated box selected with its handles, and its class, position, angle and attributes in the panel
In Hypernova Gold

Annotation Studio – Images labelled for machine learning, out as COCO, YOLO or VOC

Boxes, rotated boxes, polygons, skeletons and painted masks on a queue of images, with review, a model’s guesses to accept, and the formats training runs read.

  • Seven kinds of shape, each in a class with its attributes
  • A queue of thousands of images, with statuses and review
  • Model guesses shown with their score, accepted in one click
  • Drawn with mouse, pen, touch or entirely from the keyboard
  • COCO, YOLO and Pascal VOC in and out; nothing uploaded
  • Platforms: Web — any framework or server stack, or plain HTML5 with no build step
The BMX infinite canvas showing a product-launch board: frames named Discover, Build and Launch holding sticky notes and shapes joined by curved and right-angled arrows, a row of ideas with their votes, and two other people's cursors and selections, with the toolbar down the left and a minimap in the corner
In Hypernova Gold

Infinite Canvas – A whiteboard without edges, in your own page

The infinite canvas is a board for planning, mapping and drawing together, built into your application: fast with thousands of items, and ready for many people at once over the connection you already have.

  • Infinite canvas — sticky notes, shapes, text, images, frames, and connectors that follow what they join
  • Sixty frames a second with thousands of items on the board
  • Every change as a few lines of JSON; every copy agrees, whatever order they arrive in
  • Cursors, selections, following another person's view, and a laser pointer
  • Drag, resize, turn, align, group and vote; a pen, a highlighter and templates
  • Your own HTML inside a node, and SVG, PNG or JSON out
  • Platforms: Web — any framework or server stack, or plain HTML5 with no build step
The BMX diagram designer on an order process in three lanes, customer, shop and courier: coloured shapes from order placed to delivered, a decision with yes and no branches and a dashed reminder loop, the shape palette on the left and the selected step's properties on the right
In Hypernova Gold

Diagram Designer – Flowcharts and processes, drawn in the browser

A designer for flowcharts, processes in swimlanes and network diagrams, from a palette of over forty shapes, with connectors that find their own way around everything in between.

  • Over forty shapes — flowchart, BPMN-style process and network
  • Connectors routed around shapes, as elbows, straight lines or curves
  • Swimlanes, and automatic arrangement in layers
  • Mermaid flowcharts in and out; SVG, PNG and JSON out
  • Every change as operations another copy applies, for editing together
  • A read-only mode to show a diagram, and an outline that reads it as a list
  • Platforms: Web — any framework or server stack, or plain HTML5 with no build step
The BMX chat as a support assistant: a question about refunds, an answer that searched the help centre and cites two sources by number, then a question about checking a refund from another system, answered with highlighted TypeScript and the copy, ask again and rating buttons
In Hypernova Pro and Gold

Chat – The conversation for your own AI, with nothing sent anywhere

The conversation window for an AI assistant or a support desk. It holds no model and sends nothing anywhere: your handler asks your own service, and the chat streams the answer as it arrives.

  • Answers streamed — in Markdown, with highlighted code, tables, cited sources and the assistant's steps
  • Your server, or a model you host: return text, a stream or a fetch response
  • Or no handler at all, for a support desk where people write the replies
  • Files with a message, suggestions to start, and stop, ask again, edit and rate
  • Answers sanitised, and images left out unless you allow them
  • The whole conversation saved as Markdown, text or JSON
  • Platforms: Web — any framework or server stack, or plain HTML5 with no build step
One creator, every platform

.NET desktop, Web and AI, wherever you build

From classic desktop apps to modern framework-agnostic web components to AI-powered tools. Pick your platform.

WinForms Controls

55 exotic, heavily customizable controls: TreeListView, Borderless Form, MultiColumn ComboBox, ScrollBars and more.

See WinForms controls →

WPF Controls

Ground-breaking, MVVM-friendly components: Virtualizing WrapPanel, Ribbon, FlowChart, TreeListView and more.

See WPF controls →

Web Components

One hundred and sixty-nine framework-neutral custom elements, live now, plus typed Angular, React & Vue wrappers — and TreeListView alongside them.

See Web components →

AI Tools & GPTs

Custom GPTs and AI-powered companions for software engineering, security and more.

Explore AI tools →
Screenshot-style illustration of a custom borderless window with a gradient title bar
Featured component

Borderless Form .NET

A fully custom Form/Window for your WinForms applications: movable, resizable and heavily customizable, while keeping all the usual Form behavior you rely on.

  • Customize borders, transparency, thickness, colors and corner radius
  • Host any .NET control on the title bar
  • Customize command-button placement and title bar height
  • Plug in your own renderer for full chrome control
  • Platforms: WinForms, on .NET Framework 4.8 and .NET 6, 8 and 10
Explore all controls
One more thing

Ready to put TreeListView through its paces?

Grouping with aggregates, inline editing, banded headers, cascading checkboxes, spreadsheet paste with undo, and four export formats. Run the demos, drop in your own data, and grab a license, all on its dedicated site.

Visit treelistview.com ↗

Ready to make your app look 21st-century?

Try Hypernova free — no key, no installer — or go straight to a developer license.